One coat of paint on the walls and ceiling in the cupboard. I’ll check in the morning when it has dried to see if it will need a second. I hope not, and I’m not too fussed about it, as it is a cupboard after all. I’ll do the skirting and door frame tomorrow, and also the bathroom door frame and radiator.